GORDES NICKEL-COBALT MINE AND HPAL PLANT
Gordes Nickel-Cobalt Mine and High-Pressure Acid Leaching (HPAL) Plant is an example of the Project Development and Management services of the EGEMAD team. EGEMAD was the Project partner and managed the construction and commissioning of the plan through META Maden Ltd which is one of Egemad Group Companies. The plant has an annual capacity of 10,000 tons of Nickel metal equivalent to Nickel-Cobalt Mixed Hydroxide concentrate production. Construction and commissioning of the plant have been successfully completed in two years with a capital investment of about USD 400 million where the initial estimation was USD 800 million. The plant is successfully in operation since 2016 and the company is selling produced Mixed Hydroxide concentrate. Egemad group company META Maden Ltd. sold its shares and left the Gordes Project in 2016.
SOME OF THE MINING AND ENERGY PROJECTS & ENGINEERING SERVICES
PROJECT NAME – LOCATION | SERVICES |
Iron Ore Project
Daskesen – Azerbaijan |
Iron Ore Production & Concentration and Pelletizing Plan Feasibility Studies |
Copper Ore Mine
Albania |
Underground Ore Production Planning |
Lead-Zinc Project
Çanakkale –Turkey |
Feasibility Study, Underground Mine Production & Planning |
Lead-Zinc Mine
Grot – Serbia |
Exploration Planning |
Gölbaşı TPP Project
Adıyaman – Turkey |
Feasibility Studies for Coal Production and TPP |
Afşin Elbistan C & D Field
Coal Production (17.250.000 tons/year) TPP Project (1.200 MW) Kahramanmaras – Turkey |
Feasibility Studies for Coal Production and TPP |
Çırpılar Coal Deposit
Çanakkale – Turkey |
Feasibility Studies for Coal Production and TPP |